Khalifate Engineering & Construction Company Ltd. is a leading indigenous Nigerian engineering firm, dedicated to delivering excellence in all aspects of engineering and related activities since 2008.
Awarding Authority: Ministry of Works and Infrastructural Development, Niger State Date of Award: February 13, 2024 Contract Sum: N3,611,532,725.75 Contract Period: 8 Months Scope of Work: Site clearance, filling to formation, sub-base (200mm) and base crushed stone (200mm), 50mm asphaltic wearing course, construction of hydraulic structures.
Awarding Authority: Upper Niger River Basin Development Authority Date of Award: July 11, 2023 Contract Sum: N290,300,000.00 Completion Period: 22 weeks
Awarding Authority: Ministry of Works and Infrastructural Development, Niger State Date of Award: January 31, 2023 Contract Sum: N260,171,776.23 Contract Period: 12 weeks Scope of Work: Site Clearance, Earthwork, Concrete works in culvert and drain, Asphaltic overlay.
Explore ServiceAwarding Authority: Ministry of Works and Infrastructural Development, Niger State Date of Award: December 29, 2022 Contract Sum: N293,726,181.01 Scope of Work: General earth works, extension of existing culverts, provision of retaining walls, stone pitching works, construction of double cell box culvert 2.5mx2.5m, reclamation of land and other erosion control measures.
Awarding Authority: Federal Neuro-Psychiatric Hospital, Kaduna (FNPH/KD) Date of Award: November 24, 2022 Contract Sum: N73,260,937.00 (VAT inclusive) Completion Period: 12 weeks
Awarding Authority: YEDC Date of Award: August 29, 2022 Contract Sum: N150,822,780.00 (VAT Inclusive) Delivery Period: 12 weeks Project Location: Jambutu Injection Substation, Jimeta, Adamawa State, Nigeria Payment Terms: 50% advance against APG, 45% based on valuation/milestone, and 5% retention fee after 6 months of project delivery.
Awarding Authority: Upper Niger River Basin Development Authority Date of Award: September 30, 2022 Contract Sum: N315,113,140.63 Completion Period: 8 weeks Note: Contract to be completed within the financial year 2022.
Awarding Authority: Federal Ministry of Agriculture and Rural Development Date of Award: September 17, 2020 Contract Sum: N298,600,450.00 (inclusive of VAT) Completion Period: 12 weeks
Explore ServiceAwarding Authority: Federal Ministry of Agriculture and Rural Development Date of Award: September 13, 2022 Contract Sum: N150,000,000.00 (exclusive of VAT) Delivery Period: 6 Weeks
Phase 3 Contract for the Ongoing Road Construction of Nasarawa to Amfani Resettlement Project.
Awarding Authority: Federal Ministry of Environment Date of Award: September 23, 2014 Contract Sum: N211,305,552.60 (inclusive of all taxes) Contract Execution Period: 1 month from contract signing or site handover
Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: January 26, 2016 Contract Sum: N33,538,995.00 Contract Period: 6 weeks Scope of Work: Excavation and earthwork, concrete work, block work, re-roofing, ceiling work, electrical/mechanical, plaster work, painting.
Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: December 15, 2016 Contract Sum: N587,773,476.41 Contract Period: 6 DRY MONTHS Scope of Work: Site clearance & Earthworks, Construction of Culverts & Drainages, Asphaltic concrete finishing (50mm thickness single layer), Rigid pavement.
Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: March 30, 2016 Contract Sum: N363,082,162.00 Contract Period: 6 MONTHS Scope of Work: Construction of 1.45km of access road networks and parking lots, construction of ring and box culverts, laterite material fillings on carriageways and embankment rising, provision of filter bed/sub soil drainages, asphaltic concrete wearing course, provision of kerb stones, reinforced concrete U-channels.
Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: June 9, 2016 Contract Sum: N189,331,222.50k Contract Period: 3 DRY MONTHS Scope of Work: Site clearance, Provision of Stone Base Course, Scarification of Failed Sections, Cutting of Potholes to rectangular shape and Patched with asphalt, Provide and lay asphaltic concrete wearing course to a thickness of 60mm.
Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: January 30, 2017 New Contract Sum: N410,856,393.16k Contract Period: One Month Scope of Work: Site clearance & earth works, Concrete discharge drain, Pavement & Surfacing (Rigid pavement).
Awarding Authority: Federal College of Education, Kontagora Date of Award: April 20, 2015 Contract Sum: N35,000,000.00 (VAT inclusive) Completion Period: 8 weeks Payment Terms: N7,000,000.00 per month from April to August 2015.
Awarding Authority: Ministry of Works & Infrastructural Development, Niger State Date of Award: July 15, 2010 Contract Sum: N61,962,234.20 (Note: Another document states N57,952,536.20k for the same project) Contract Period: 14 days Scope of Work: Site clearance and earth works, Concrete works, Road work and surfacing.