Construction of 5KM Mariga Township Road, Niger State (Lot 18)

Awarding Authority: Ministry of Works and Infrastructural Development, Niger State Date of Award: February 13, 2024 Contract Sum: N3,611,532,725.75 Contract Period: 8 Months Scope of Work: Site clearance, filling to formation, sub-base (200mm) and base crushed stone (200mm), 50mm asphaltic wearing course, construction of hydraulic structures.

img 02
Construction

Construction of 60-Meter Bridge on Rural Road Tungan-Wawa-Andapo Madengen-Ganawa

Awarding Authority: Upper Niger River Basin Development Authority Date of Award: July 11, 2023 Contract Sum: N290,300,000.00 Completion Period: 22 weeks

img 03
Construction

Construction Additional Works (Dadin Kowa-First Bank) in Respect of Ongoing Construction of Two Number Roads in Kontagora

Awarding Authority: Ministry of Works and Infrastructural Development, Niger State Date of Award: January 31, 2023 Contract Sum: N260,171,776.23 Contract Period: 12 weeks Scope of Work: Site Clearance, Earthwork, Concrete works in culvert and drain, Asphaltic overlay.

Explore Service
img 04
Erosion control

Erosion Control Measure and Construction of 2.5MX2.5M Double Cell Culvert at Unguwan Magajiya, Gadan Zabarma Bayan Kasuwa and Access Road to Unguwan Yamma Grave Yard in Kontagora

Awarding Authority: Ministry of Works and Infrastructural Development, Niger State Date of Award: December 29, 2022 Contract Sum: N293,726,181.01 Scope of Work: General earth works, extension of existing culverts, provision of retaining walls, stone pitching works, construction of double cell box culvert 2.5mx2.5m, reclamation of land and other erosion control measures.

img 05
Maintanance

Re-Asphalting of Internal Access Roads, Car Parks and Renovation of Drainages

Awarding Authority: Federal Neuro-Psychiatric Hospital, Kaduna (FNPH/KD) Date of Award: November 24, 2022 Contract Sum: N73,260,937.00 (VAT inclusive) Completion Period: 12 weeks

img 06
Reconstruction

Reconstruction of Jambutu Injection Substation, Jimeta, Adamawa State

Awarding Authority: YEDC Date of Award: August 29, 2022 Contract Sum: N150,822,780.00 (VAT Inclusive) Delivery Period: 12 weeks Project Location: Jambutu Injection Substation, Jimeta, Adamawa State, Nigeria Payment Terms: 50% advance against APG, 45% based on valuation/milestone, and 5% retention fee after 6 months of project delivery.

img 07
Construction

Rural Road-Usalle Rijiyan Nagwamatse Main Road by Primary School Side-Linked to Gongo Village-Kampanin Waya

Awarding Authority: Upper Niger River Basin Development Authority Date of Award: September 30, 2022 Contract Sum: N315,113,140.63 Completion Period: 8 weeks Note: Contract to be completed within the financial year 2022.

img 08
Construction

Construction of 3.0KM Asphaltic Road at Bukan Village-Kkaga Dama Village, (Off Pambegua-Kauru Road) Kauru LGA, Kaduna State

Awarding Authority: Federal Ministry of Agriculture and Rural Development Date of Award: September 17, 2020 Contract Sum: N298,600,450.00 (inclusive of VAT) Completion Period: 12 weeks

Explore Service
img 09
Sensitization

Sensitization of the General Public on the Importance and Benefits of the Green Imperative Project, Procurement of 7 HP Water Pumps and Accessories for IA&CD, and Procurement of Draught Animal Power (Work Bulls/Ox, York, Cart, Ridger)

Awarding Authority: Federal Ministry of Agriculture and Rural Development Date of Award: September 13, 2022 Contract Sum: N150,000,000.00 (exclusive of VAT) Delivery Period: 6 Weeks

img 09
Asphalting

Asphalting to Control Erosion of Tudun Wada Kontagora Road, Niger State

Awarding Authority: Federal Ministry of Environment Date of Award: September 23, 2014 Contract Sum: N211,305,552.60 (inclusive of all taxes) Contract Execution Period: 1 month from contract signing or site handover

img 09
Construction

Construction of Gate House and Fencing of Kontagora Government Lodge.

Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: January 26, 2016 Contract Sum: N33,538,995.00 Contract Period: 6 weeks Scope of Work: Excavation and earthwork, concrete work, block work, re-roofing, ceiling work, electrical/mechanical, plaster work, painting.

img 09
Construction

Rehabilitation/Construction of (3) No. Selected Road in Kontagora Township.

Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: December 15, 2016 Contract Sum: N587,773,476.41 Contract Period: 6 DRY MONTHS Scope of Work: Site clearance & Earthworks, Construction of Culverts & Drainages, Asphaltic concrete finishing (50mm thickness single layer), Rigid pavement.

img 09
Construction

Construction of Access Road/Parking Lots and Loading Bays at Chachaga Water Works, Minna.

Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: March 30, 2016 Contract Sum: N363,082,162.00 Contract Period: 6 MONTHS Scope of Work: Construction of 1.45km of access road networks and parking lots, construction of ring and box culverts, laterite material fillings on carriageways and embankment rising, provision of filter bed/sub soil drainages, asphaltic concrete wearing course, provision of kerb stones, reinforced concrete U-channels.

img 09
Maintenance

Maintenance of Tegina-Zungeru Road, Niger State (Total Length = 36KM)

Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: June 9, 2016 Contract Sum: N189,331,222.50k Contract Period: 3 DRY MONTHS Scope of Work: Site clearance, Provision of Stone Base Course, Scarification of Failed Sections, Cutting of Potholes to rectangular shape and Patched with asphalt, Provide and lay asphaltic concrete wearing course to a thickness of 60mm.

img 09
Rehabilitation

Rehabilitation of Internal Access Road within Water Board Minna (Upward Review).

Awarding Authority: Ministry of Works and Transport, Niger State Date of Award: January 30, 2017 New Contract Sum: N410,856,393.16k Contract Period: One Month Scope of Work: Site clearance & earth works, Concrete discharge drain, Pavement & Surfacing (Rigid pavement).

img 09
Rehabilitation

Rehabilitation of College Dual Carriage Access Road from the College Gate to Agricultural Education Department Junction

Awarding Authority: Federal College of Education, Kontagora Date of Award: April 20, 2015 Contract Sum: N35,000,000.00 (VAT inclusive) Completion Period: 8 weeks Payment Terms: N7,000,000.00 per month from April to August 2015.

img 09
Construction

Construction of Dual Carriageway Access and Internal Roads and Parking Spaces at Nasko General Hospital in Magama Local Government Area Council

Awarding Authority: Ministry of Works & Infrastructural Development, Niger State Date of Award: July 15, 2010 Contract Sum: N61,962,234.20 (Note: Another document states N57,952,536.20k for the same project) Contract Period: 14 days Scope of Work: Site clearance and earth works, Concrete works, Road work and surfacing.